Past Performances
Project 1:
GSA REGION 6 - Small Office Maintenance Contract
Project SOW: St. Louis Regional Offices & Buildings
SCOPE OF WORK DOLLAR VALUE: $1,000.000.00
- Voice/Data/AV – Horizontal & Backbone Network Cabling
- Fiber Optic – Indoor/Outdoor, Horizontal & Backbone Design
- MDF/IDF – Closet Design and Build Out
- PBX & Key Systems, Design, Install, Service
Project 2:
ST. PETERS JUSTICE CENTER
Project SOW: Saint Peters Police Station & Justice Center – Network Cabling, Security, Access Control, CCTV, Intercom, & AV Systems
Scope of Work Dollar Value: $545,000.00
- Network UTP Voice Cabling
- Network Shielded Data Cabling
- Single/Multi-Mode Fiber Optics
- Access Control & Security Systems
- CCTV System, Exterior and Interior
- AV Systems for Court Rooms, Council Chambers, & Public Broadcasting
- MDF & IDF Closet Design and Build
Project 3:
CHURCHILL CENTER & SCHOOL
Project SOW: Churchill Center & School Network Cabling, Classroom Technology, Commons/Stage Sound and AV Systems, CATV
SCOPE OF WORK DOLLAR VALUE: $265.000.00
- Voice and Data Network Cabling
- Intercom/Paging System
- Fiber Optics
- Backbone & Riser Cabling
- CATV Distribution System
- Class Room Technology/Teaching Systems
- Commons/Stage AV Systems
- Gymnasium Sound Systems
- Building Ground System
Project 4:
HERMAN AREA HOSPITAL
Herman, Missouri
Project SOW: IP Telephone, Intercom/Paging, Wireless Network, & Network Cabling Systems
SCOPE OF WORK DOLLAR VALUE: $370,000.00
- PBX Telephone System, VOIP/DIGITAL/ANALOG/WIRELESS
- Voice /Data Network Cabling System
- Backbone Infrastructure – Copper/Fiber Optic
- Wireless Network System
- Paging/Intercom System
- Network System for Patient MRI Scans
- MDF/IDF Closet Design and Build
- Network Ground System
Project 5:
Cuivre River Electric CO-OP
Troy, MO. 63379
Project: C.R.E.C. New HQ Wentzville, MO
Project SOW: Intercom/Paging, Wireless Network, & Network Cabling Systems
Scope of Work Dollar Value - $125.000.00
- Design and Install
- CAT 6 Voice /Data Cabling - Install Terminate and Test
- Backbone Infrastructure - 6 Strand MM Fiber
- Wireless Data System
- AV & Intercom System
- Installation period 9 weeks, 4 personnel
- Job start June 2007 – Job completion August 2007, (new construction)
Project 6:
US GSA
1222 Spruce Street
St. Louis, Missouri 63108-2818
Project: Thomas F. Eagleton Courthouse, U.S. Marshall’s/FBI/Security Witness/Judges Chamber
Scope of Work Dollar Value: $425,000.00
- Approximately 1000 CAT5E Voice/Data Cable Runs, above and below floor – Install, Test, Terminate
- Build MDF & IDF closets, US Marshall’s, FBI,
- 4000 Feet 6 Strand MM Fiber, install, terminate, and test
- 3500 feet of Riser Connecting closets from 23rd floor to –2nd floor
- Valcom Intercom System - 400 Speakers, Looped Cable Runs, 8 Power Supplies
- Install, adjust and test. 5 floors of Facility
- Coaxial Cable Runs – 6,000 feet, install, terminate and test
- Coordinate with customer on a daily basis, schedule available areas for work, adjust cable count as needed, perform adds, and other adjustments.
- Provide customer with paper and magnetic copy of test results for data cabling and fiber optic testing ensuring EIA/TIA standards. Provide customer with schematic with updated number plan for cabling drops.
- Scope of Work Dates: 7/2000 thru 9/2001 New Construction
Project 7:
US GSA
1222 Spruce Street
St. Louis, Missouri 63108-2818
Project: St. Louis Government Facilities
Scope of Work Dollar Value: $900,000.00
- Design and Installation Indoor & Outdoor Cable Plant
- Voice/Data Cabling – CAT 6, Cat 5, Cat 3
- Coaxial RG6 & RG59
- Fiber Optics Multi & Single-Mode, 6 – 24 Strand
- Backbone Riser Cabling – 25 to 600 pair
- Grounding
- Scope of Work Dates: 11/2007 thru 10/2012
Many other major projects not listed.